Air Liquide
Follow by Email

Fillmore Construction was retained by Air Liquide Canada Ltd. To provide Design Build services to build a new 26,000ft2 Western Canada Bulk Distribution Building in Edmonton, Alberta. This project was originally tendered in 2008 at which time Fillmore Construction was the low bidder at $8.2M. Air Liquide had a limited construction budget of $5.0M, so over the next two years Fillmore Construction worked closely with Air Liquide to completely redesign the project on a design build basis to decrease to project budget to $5.0M. This resulted in a 40% reduction in cost for effectively the same end product.